Novant Health | Compliance Documentation 401
Novant Health | Compliance Documentation 401
Resumen de Assessment
Se completó 0 de 8 Preguntas
Preguntas:
Información
Ya has completado el assessment anteriormente. Por lo tanto, no puedes volver a iniciarlo.
Assessment se está cargando…
Debes iniciar sesión o registrarte para comenzar el assessment.
Primero debes completar lo siguiente:
Resultados
Resultados
0 of 8 Preguntas answered correctly
Your time:
El tiempo ha transcurrido
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categorías
- Novant Health | Compliance Documentation 401 0%
- Reseña
- Respondido
- Correcto
- Incorrecto
-
Question 1 of 8
1. Question
Which of the following line items is/are required by CMS as part of testing documentation for life safety systems?
1. Required Frequency of the activity
2. NFPA Standard ReferenceCorrectIncorrect -
Question 2 of 8
2. Question
Emergency generators are tested once every 12 months using supplemental loads. What Joint Commission Standard and EP address this requirement?
Emergency generators are tested once every 12 months using supplemental loads. What DNV standard addresses this requirement?
CorrectIncorrect -
Question 3 of 8
3. Question
At what frequency must elevators with firefighters’ emergency operations be tested?
CorrectIncorrect -
Question 4 of 8
4. Question
Emergency generators that are annually load bank tested, shall be tested in the following manner:
CorrectIncorrect -
Question 5 of 8
5. Question
What frequency is required for dry chemical fire extinguisher hydrostatic testing?
CorrectIncorrect -
Question 6 of 8
6. Question
How often shall the fusible links for a kitchen Ansel system be replaced?
CorrectIncorrect -
Question 7 of 8
7. Question
Which Joint Commission standard is associated with checking medical gas outlets?
Which DNV standard is associated with checking medical gas outlets?
CorrectIncorrect -
Question 8 of 8
8. Question
Which Joint Commission standard is associated with maintaining and testing emergency power systems?
Which DNV standard is associated with maintaining and testing emergency power systems?
CorrectIncorrect
